Sophomore Clinic - Fall 2004 - Engineering Resources

THE HOISTINATOR

Students design and build cranes that lift as much as 1200 pounds!

Syllabus|Schedule|Teams|

Rocket|Hoistinator|Construction|Testing|Clarifications|Advice|SCORES

Lectures|LCA|Economics|Drawing|Timer

Literature Review Assignment

Faculty Web Sites

Engineering: |Prof. Head|Prof. Zhang|Prof. Constans|Prof. Dahm|Prof. Everett|

Communications: |Prof. Harvey|Prof. Hutto|Prof. Courtney|


Syllabus

Schedule

Monday | Thursday

Teams

Monday | Thursday


Rocket

Students design, construct and launch a bottle rocket in about an 1 hour. Some go over 400 ft.

 

 

In the picture to the right, follow the water trail from the launcher to see the rocket.

Hoistinator

The semester-long project this year is to design, build, and test a crane arm using a small amount of aluminum and plastic bar stock, plus a few other things. The crane will lift 400 lbs in 4 seconds to a height of 2 feet. Students also design, build, and test a device to time the lift.

Construction

Don't start cutting and drilling your aluminum and plastic pieces until given the go ahead in class.

Testing

You will be able to test your crane by installing it on the crane substructure and lifting a relatively light weight. The reason for doing this is to check that your design is compatible with the crane substructure (see advice). You will NOT be able to test your crane with "competition" weights before the competition.

Clarifications

We won't anticipate every contingency (just like a real-world-project!), so from time to time, clarifications will be posted here.

Advice

Constructed devices and engineering drawings do not always match, so check the dimensions of the crane bases!


Lectures

Intro to design

LCA

Sensors

Digital Circuits

LCA

Short Guide for Using ECO-it | Default ECO-it File from last year.

EPA Web site on LCA - Get a good intro to LCA

Life-Cycle Web site - Good links to LCA on the web

ECO-it Web site - This is the Web site of the company that makes the LCA software we use.

Eco-indicator 99 Methodology report

Eco-indicator 99 Annex report

Eco-indicator 99 Manual For Designers

Economics

Economic Analsyis Guide

Drawing

Compressed Folder of Solid Works of crane base v3

Crane Base ACAD drawing from last year (better check to make sure it is correct. First student to send me a correct drawing gets extra credit!)

AutoCAD Tutorial - work all six tutorials and you will be AutoCAD ready!

To do the AutoCAD tutorial, you need to save the AutoCAD file "Startpage" to your drive. From the tutorial or Sophomore Clinic website, right click on Startpage and "Save Target as" to the location best for you.

The tutorial was designed for AutoCAD 2000i. We've found it works well with later versions of AutoCAD; hwoever, some commands and layouts may be different.

Timer

4-input-AND-gates|4-input-NAND-gates|4-input-NOR-gates|4-input-OR-gates|

555-Timer|COUNTER+DECODER|COUNTER|DECODER|INVERTER|7-seg-display|

common-cathode-display|