Freshman Clinic II- Sections 2 and 5 - Spring 2003 - Dr. Everett
Week Of
Lecture
Lab
Assignment*
January 19
No Class
Introduction / Safety / House of Quality

Portfolio (individual), HoQ (individual)

January 26
Snow Day
Mag-Lites
Mag-Lite Report (team)
February 2
Reverse Engineering

Drawing

Introduction to Water Filters: How do they work?

Brainstorming

Simple Physical Testing

Mid-Semester Report & Presentation (team)
February 9

Ethics & Patents

Codes

Drawing
Drawing (individual: ME and CEE), Miox Purifier and Steri-pen (individual: ChE and ECE)
February 16
Water Quality

Quiz: Rev. Eng, HoQ, Safety, Ethics, Patents

Water Quality Testing

February 23
Pathogens
Water Quality Testing

Ergonomic and Aesthetic Testing

March 1
Adsorption

Adsorption Testing

Adsorption Report
March 8
Presentations
Mid Semester Presentations
Final Report (team)
March 15
Spring Break, No Classes
March 22
Water Treatment Lecture

Quiz: Water Quality, Pathogens

Field Trip

Final Poster (team)
March 29
Design of Experiments

Ergonomic and Aesthetic Testing

Pressure Testing

April 5
Data Analysis

Quiz: Water Treatment, Design of Experiments

Pressure Testing

 

Water Filter Review Website Repor (team)
April 12
Green Engineering

Water Filter Review Website Format

Stroke Force Testing

April 19
Economics
Stroke Force Testing
April 26
Review

Quiz: Data Analysis, Green Engineering, Economics

Finish Water Filter Review Website Report

Finish any Remaining Lab Work

Work on Final Report and Poster

May 3
Final Report and Poster
No class

*The "assignment" column identifies when students should start working on assignments. Read the assignment description by the beginning of the week identified above. See the Homework page for due dates.